GEOGRAPHICAL LOCATION:
Project located in Toc Tien hamlet,Tan Thanh district, Baria-Vungtau province, away 75km from Ho Chi Minh City and 35km from Vungtau City, and 4 km from Phu My central town.
Project is in valley between 2 mountains of Thi Vai and Toc Tien which have completely been primeval original with its cool climate around year and temperate about 22-28 C degree .
AREA:
Area of project is 179.5ha consist of following sections:
1/ HOLLYWOOD (Area: 6 -7 ha)
-Available all natural forest and mountain scenes
-Temple, shrine, walls and old town (movie)
-Make movie with modern street and city scenes
-Studio
2/ COMPLEX AREA (Area: 3- 4 ha)
-Conference Center including 2 halls with 200 seats and 500 seats and available gallery
-Restaurant of European, Asian and Vietnamese dishes… located around Sky view mountain.
-4 star hotel available
3/ RESORT SECTION (Area: 7- 9 ha)
4/ VIETNAMESE ETHNIC CULTURAL VILLAGE (Area: 4 -5 ha)
-Landscape of lake, spring
-Including: Northern minority floors, West highland traditional floor, Hue styled traditional floor, Northern plain traditional folk floor… accompanied with daily activity, culture, production.
5/ ENTERTAINMENT, SPORT AND SHOPPING:
For Sport Section:
-Sport club, tennis yard, climbing, sport race bicycle, cliffs, slipping grass
For Entertainment Section:
-Minority game, game for kids, swimming pool, slip spiral bridge
For Shopping:
-Including mall, coffee shop, aerobic, spa
-Picnic camping
6/ FOR ZOO AND GARDEN:
-As precious pets section on mountainous accessing path
-Landscape of natural green trees, water ( with natural stones)
7/ VILLA SECTION (Area : 36 - 40 ha)
8/ LUXURY APARTMENT SECTION, TRADE, SERVICE : (Area: 3 - 4 ha)
9 / KINDERGARTEN (Area: 1-1.5ha)
10/ ELEMENTARY SCHOOL (Area: 1,5 -2ha)
11/ URBAN CLINIC (Area: 0.5-1ha)
12/ FOOD SECTION (Area: 1-1.5ha)
13/ RESERVATION gallery of forest, community cultural activist
14/ COOLING HOUSE
15/ HUT of Rest stop, Fishing hut
16/ PARK of natural beauty, exhibition, heritage…
ROAD SYSTEM
Location of city area located on the best main road system.
1/ For road:
Being on provincial road No.81, passed by National Road No.51 through over Phu My town of 4km with express way project of 8 lanes crossed ahead.
2/ For water way:
Port network located Tan Thanh district such as: Phu My Port, Baria-Serece Port, especially Cai Mep -Thi Vai Port is acceptable weight of 160,000 tons boat
3/ For Air way:
Away 90 km from Tan Son Nhat International Airport and 45km from Long Thanh International Airport.
Expected investment capital under project : USD 60 millions.
Leasing land duration: 50 years
Policy in favor of investment:
-Tan Thanh district is favor of investment under Decree No.108/2006/ND-CP dated Sept 22,2006 by Prime Minister.
-To be entitled favourite tax rate, duty duration, tax exemption and reduction based on Regulation on tax and duty.
-In favour of consultant, information on law, economic and market.
SOME SPECIALIZED LANDSCAPE PHOTOS
|